The bill proposes the implementation of differential electricity rates for Chaco, Corrientes, Formosa, Misiones and northern Santa Fe – as long as those areas do not have natural gas network connection -, resulting from the application of the ENRE’s rate schedule reduced by at least 30%.
For lack of information, the OPC is not in a position to estimate an accurate fiscal cost of the bill under analysis.